A shape and sizing handoff should be its own document block, not a footnote under the mood board. Buyers get cleaner samples when shape choice, sizing inputs, artwork reference, craft or finish reference, and quality-check implications are each written as a separate item that a factory can confirm or reject on its own. That separation matters because 365nails customization can cover design and artwork, shape and sizing, craft and finish, private label packaging, product photography, and video assets — treating these as one blob makes it hard to tell which change caused a sample issue.
Why shape and sizing need their own block
Artwork is a visual target; shape and sizing are fit parameters. Mixing them invites the reading that a size change is an artwork change, or that a longer tip is a design revision. Splitting them gives each item a single owner, a single approval, and a single record. When a sample comes back wrong, the block structure tells you whether to reopen the shape sheet, the size chart, or the artwork file.
Document each required block separately
1. Shape choice
Name the silhouette (for example almond, square, coffin, oval, or ballet) and state the intended nail length and edge style. Use plain language plus a reference image; do not rely on a single word that carries different meanings between brands. Label any shape taken from a competitor or trend image as an industry reference, not as 365nails policy.
2. Sizing inputs
Record how sizes were derived: which finger set was measured, which measurement method was used, and which size scale the chart follows. Attach the size chart as its own file so it can be revised without touching the shape page. If sizing is still provisional, mark it provisional in the handoff rather than implying it is final.
3. Artwork reference
List the artwork files, color references, and any placement notes that sit on top of the nail. Keep the color reference separate from finish language so a shade question is not confused with a gloss or texture question. Reference file names and versions so the factory confirms the exact file set.
4. Craft or finish reference
Describe surface treatment, decoration type, and any 3D elements as a craft and finish block. This is where the production route can matter: 365nails supports handmade small-batch customization, machine-made scale production, and private label packaging in one coordinated supply chain, so state which path the sample should reflect.
5. Quality-check implications
For each block above, note what acceptance should look at. The 365nails custom quality process covers material selection, edge checks, decoration firmness, color references, batch consistency, and pre-shipment inspection, which gives a natural checklist: edge checks map to shape, color references map to artwork, decoration firmness maps to craft and finish, and batch consistency ties the sizing chart to repeat orders.
Common handoff failures to prevent
- A shape name alone with no length or edge reference, leaving the sample open to interpretation.
- A size chart pasted inside the artwork file, so a sizing revision looks like a design change.
- Finish words like "glossy" or "matte" used as color references, blurring two separate approvals.
- No stated production route, so handmade and machine-made samples are compared unfairly.
- Quality notes written as general comments instead of tied to a specific block.
365 Take
Treat the shape and sizing handoff as the fit contract and the artwork and finish handoff as the visual contract. Keep them in separate files with separate approval lines, then join them only at the quality-check stage. That structure is what makes a revision traceable, and it is the fastest way for a brand team to tell whether a sample problem is a fit problem or a finish problem.
Operator Move
Before sending the brief, build five short blocks — shape choice, sizing inputs, artwork reference, craft or finish reference, and quality-check implications — each with an owner, a version number, and one acceptance line. Send them as separate attachments and ask the factory to confirm each block individually. When you are ready to scope the project, request customization and share the split documents, or contact sales if you need to clarify the production path first.

